FinishingHard
Complete Bathroom Renovation
Marupe, LatviaPosted 218d ago7 applications
Description
Complete bathroom renovation, including removing all existing fixtures and tiles from walls and floors. Install underfloor heating (electric), and set up a new bathtub, shower cabin, toilet, bidet, and sink with a cabinet. Lay new tiles on both the floor and walls. Also, repair the towel dryer. The bathroom is located on the second floor.