RepairsHard

Install Boiler and Fixtures

JelgavaPosted 83d ago1 application

Description

We need to finish the upper part with wall panels or an alternative solution. A boiler needs to be installed (a recess is made in the wall) - the boiler has already been purchased. An electrical outlet must be cut into the tiled wall, and a toilet must be installed. The work will take 1-2 days. Please respond only if you are skilled at this work; do not disturb if you are not qualified.

Photos

Posted byR
Rihards
0.0· 0 jobs posted
View full profile