ElectricalHard

EV Charging Installation

Rīga, LatviaPosted 91d ago2 applications

Description

Looking for a certified electrician to run a 70-80 meter cable from the distribution board to the garage for EV charging. Approximately 50 meters of the cable needs to be run through technical shafts and the rest along the wall. No digging is required. A combined residual current device and meter need to be installed at the distribution board. In the parking space, a distribution box, combined socket, and switch need to be installed. The work is expected to take 1-2 days. I would like to receive a quote.

Posted byM
Marcis
0.0· 0 jobs posted
View full profile