ConstructionHard
Build Gas Concrete Wall
JaunolainePosted 164d ago0 applications
Description
We need to build a 35m3 wall using 300mm gas concrete for a first-floor building. Reinforcement should be done with d8 rods. Ready gas concrete lintels are required. A monolithic strip with a height of 150mm is also needed. There are a total of two buildings available for this project. Masonry work is planned to start at the end of April.